Solutions · C&I · Telecom towers

Same brain. Different fleet.

A bank's rooftop portfolio, a factory's hybrid plant, or 400 tower sites on diesel — operationally they're the same problem mini-grids have: distributed assets, fuel waste, and no one watching closely enough. The operating layer transfers.

16+
Grid collapses

Nigeria's national grid failures in 2024–25 — why every serious C&I load runs its own hybrid plant.

350k
Towers on diesel

African telecom sites burning fuel around the clock — the sector's largest single decarbonization lever.

24/7
SLA truth

Verified uptime and fuel-offset numbers your customers and carriers can audit, not take on faith.

01 · Asset truth

Batteries are your capex. Know them cell by cell.

Tower estates and C&I plants live and die on battery replacement cycles. Gen318 tracks state-of-health against West-African heat profiles, staggers replacements, and opens the work order weeks before the failure.

Battery health · string B2 · Kaduna-12
84%SoH
Remaining useful life412 days
Cell divergence+1.8% / wk
Heat-cycling modelWEST AFRICA v3

Flagged 19 days before projected failure — work order WO-0142 opened automatically with parts list attached.

97.1%VIC
SMA
HUA
GRO
MOD

Hardware comparisons

Uptime, fault rates, and serviceability compared across every brand in your fleet — procurement decisions from your own data, not spec sheets.

02 · Procurement, evidenced

Your next 100 sites, specified by your last 100.

Fleet-scale estates buy hardware continuously. Gen318 turns your own uptime and fault history into vendor scorecards — so the next tender is argued from data, not datasheets.

03 · Remote by definition

Tower sites don't have broadband. Neither do we.

The edge node keeps optimizing with no network at all, and the sync engine is budgeted for 2G — alerts first, history when the signal allows. When the internet drops, your system shouldn't.

4-tier priority sync · bandwidth budget on 2GEDGE BUFFER: 30+ DAYS
T1
Alerts & safety
immediate · bytes, not payloads
T2
Control acks
seconds · command confirmations
T3
Telemetry
batched · compressed on the edge
T4
Bulk history
opportunistic · waits for good signal

When the network drops, nothing is lost — the queue drains in priority order when signal returns.

04 · The evidence

Numbers you can check.

$2B

Nigeria's C&I solar EPC market, growing at 30.1% CAGR as businesses exit the failing grid.

Market analyses · Gen318 strategy docs
~$6B/yr

Diesel spend across Africa's tower estates — roughly 350,000 of 500,000 sites still burn fuel as primary or backup.

Telecom infrastructure analyses
803 MW

New solar installed in Nigeria in 2025 alone (+141% YoY), 96% of it decentralized — the fleet is already being built.

Africa Solar Outlook 2026
+305%

Battery storage growth in a single year — every megawatt-hour of it needs health management in tropical heat.

Africa Solar Outlook 2026

Pilot it on your worst ten sites.

If the fleet brain pays for itself there, it pays everywhere.

Talk to the team